2 Arena Central, Birmingham

Loop Engineering were appointed to undertake the overall MEP design monitoring and performance design on behalf of an international banking client.

The new 11 storey (incl 3 basement levels) flagship building is located in the Centre of Birmingham. The building will benefit from the latest high efficiency technologies and aims to achieve LEED Gold status. All major equipment shall be provided with N+1 resilience which includes chilled, LTHW and ventilation systems, N+N arrangement for the UPS and on site generators.

Currently undergoing the CAT-A infrastructure works with CAT-B works scheduled to commence in 2016.