Kensington Close Hotel – London

Due diligence – Loop Engineering were appointed to provide a comprehensive performance assessment of mechanical and electrical services installed during the extension and refurbishment works.

The works involved the renovation of the existing wings and erection of the new wing and an extra floor which, resulted in the increase of the bedrooms count from 550 to 708. For the purpose of the project Loop investigated the quality of workmanship and materials as well as the cost associated with the works. Loop prepared a thorough evaluation of the O&M Manuals and produced a recommendations list on how to improve the day-to-day operation of building services within the building.