London data centre migration & consolidation

£7M phased migration of live Tier 3 data centre operations from central London site.

Data centre space was consolidated and the converted space was refurbished as offices.

 

Site Works included:

  • overhauling existing HV turbine generators
  • UPS consolidation
  • UPS upgrades to Trader floors
  • installation of automatic load shedding system