£7M phased migration of live Tier 3 data centre operations from central London site.
Data centre space was consolidated and the converted space was refurbished as offices.
Site Works included:
- overhauling existing HV turbine generators
- UPS consolidation
- UPS upgrades to Trader floors
- installation of automatic load shedding system